INTILION scalestac 154 kWh complete assembly by INTILION
Price is valid only for Germany. For other countries please inquire prices individually!
On-site service for installation and commissioning:
- Arrangements with the authorities and the energy supplier
- Grounding and, if necessary, lightning protection system, if required, foundation
- Forklift truck/lift truck/crane for unloading and placement
- AC cabling to the storage tank incl. test protocol
- Reconstruction of existing low-voltage distribution board, incl. concluding works
- Data link for communication incl. test protocol
- Sub Smart Meter cabling and connection to the existing distribution board
- Measurement with test protocol
No posts found